REATDP Power Transformers Project

8Nos. of 132/33kV, 31.5MVA Power Transformers manufactured by M/s. BEST Transformer – Turkey, were supplied, delivered, installed and tested in 4 grid substations, namely Maliboda, Ragala, Wewalwatta and Nawalapitiya in 2019, under the Renewable Energy Absorption Transmission Development Project (REATDP) of Ceylon Electricity Board funded by AFD (French funding agency).

This is the first project undertaken by OLEX to provide transformers to our utility, which included the scope of providing logistics from the manufacturers place to project sites and performing all required tests at sites with the support of technical experts from M/s. BEST – Turkey.

EHV Oil Filled Cable Joint Project

A joint and repair on a 132kV Oil filled Cable from Kelanitissa Power Station to Colombo Substation F, was executed in 2015/2016, under Colombo City Division of Ceylon Electricity Board. The jointing was performed by M/s. Rosche Engineering GmbH – Germany together with M/s. A & A Dinar – Malaysia, using the oil filled joints supplied by M/s. GA Hochspannug Leitungsbau GmbH – Germany.

MV Plug-in Terminations

Installation and Testing of 6 nos. of 33kV size 3 Indoor plug in type cable terminations manufactured by M/s. Sudkabel, Germany were successfully completed in 2019.

They were installed in 33kV Gas Insulated Switchgears, at Pannala Grid Substation under Transmission Construction Projects (TCP) of Ceylon Electricity Board.

Bolawatta - Seetawaka Power Transformer Project

2Nos. of 132/33kV, 31.5MVA Power Transformers manufactured by M/s. BEST Transformer – Turkey, were supplied, delivered, installed, tested and commissioned in Bolawatta and Seetawaka Grid Substations in 2021.

This project undertaken by OLEX, included the scope of providing logistics to project sites and performing all required tests at sites with the support of technical experts from M/s. BEST – Turkey.